Guest guest Posted October 11, 2006 Report Posted October 11, 2006 Mold in Capitol forces closings October 11, 2006 Rutland Herald - Rutland,VT By Louis Porter Vermont Press Bureau http://www.rutlandherald.com/apps/pbcs.dll/article? AID=/20061011/NEWS/610110381/1004/NEWS03 MONTPELIER — A mold infestation in the bottom floor of an addition to the Statehouse has closed that portion of the building and is forcing the state to spend up to $30,000 to correct the problem. The mold has grown behind wallboard in the offices of the Legislative Council, the group of researchers and assistants who aid legislators. About eight cubicles have been closed for several weeks while work is being done. Officials said the offices should reopen by January, when the lawmaking session begins. Workers are adding a ventilation system that uses suction to keep areas behind the wallboard dry. Officials are hoping the system also prevents mold from affecting workers if it grows back. " We will have additional testing after the work is complete, " said Tasha Wallis, commissioner of buildings and general services. The work, which is not yet complete, is expected to cost about $30,000. The problem probably developed because the foundations for the Statehouse and the addition are set into bedrock, portions of which were blasted away during construction. In the lower offices, water condenses or runs over the bedrock into spaces behind the walls. The foundation's construction makes it almost impossible to completely eliminate water that creates an environment conducive to mold, said McArdle, project engineer for the Department of Buildings and General Services. This year's unusually rainy weather may have added to the problem, he said. In addition to installing a new ventilation system, which draws air from behind interior walls and sends it outside, the workers have sealed cracks along the outside walls of the building and rebuilt interior walls with mold resistant materials, McArdle said. Mold in buildings can be difficult to get rid of and can cause health problems, including allergies, according to the Vermont Department of Health. The state is investigating whether the state office building in Bennington has made employees sick, after an unusually large number of workers there appeared to contract illnesses that could be related to mold or bacteria. The Statehouse was built in 1859, and the addition where the mold was found was erected in 1899, said Curator Schutz. Almost all of the additions to the Statehouse have required additional blasting of bedrock. The marble floor of the Statehouse is laid directly onto leveled and smoothed bedrock, without a basement below it, he said. The floor's black and white marble is from two Vermont quarries. The black marble is from the now-closed fossil-rich quarry of Isle la Motte. The white marble is from Danby. , chief legislative counsel, said temporarily losing office space has not yet interfered with his staff's work, since some employees who use the space work only during session months, and others found makeshift workspace within the building. " They have been able to find seats in the committee rooms, " he said. " It hasn't been a problem for us yet. " And it's possible it never will be. A large fan that draws air from the moldy part of the building has been delivered, and the work should be finished soon, Wallis and McArdle said. Because the part of the building infested by mold already had a circulation system designed to completely replace the air every few minutes, McArdle said he doubted any workers were at risk for developing mold-related problems previously. Still, the addition of the new venting mechanism should eliminate the potential for a problem, he said. Contact Louis Porter at louis.porter@.... Quote
Recommended Posts
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.