Guest guest Posted September 20, 2006 Report Posted September 20, 2006 More leaky condo and mould problems in South Coastal BC September 19, 2006 - 12:00 pm By: Weisgarber http://www.news1130.com/news/local/article.jsp? content=20060919_134616_2292 News1130 - Vancouver,British Columbia,Canada VANCOUVER (NEWS1130) - About sixty Co-Op housing developments in the Lower Mainland and on Vancouver Island have fallen victim to the same issues affecting leaky condos. Rising construction costs are continuing to put a damper on repairs, but a solution may be in the works. The extent of the problem ranges from a slight inconvenience to a major catastrophy depending on the buildng. Darren Kitchen with the Co-operative Housing Federaton of BC says the mould is so extensive in some units, they're uninhabitable. Ten co-ops have now been fully repaired and four are under construction, but it's getting more and more expensive. The co-ops are in the process of negotiating a new lending formula with Canada Mortgage and Housing Corporation. Kitchen doesn't expect any legal action over the leaks. Most of the co-op buildings were built around the same time as the leaky condos. Typically, about half of the people in any one building are receiving some kind of financial assistance to make their housing more affordable. But at one Surrey housing complex the problem is becoming severe. Single moms, people with mental health issues and other low income tenants may end up leaving the complex due to mould and water problems. BC Housing is now offering to help relocate people in Peninsula Estates, but there's still no word on money for repairs. Water seeping through the floors and black mould inside suites are just some of the problems plaguing the rental complex. Wheeler with Peninsula Estates Housing Society says the building is poorly designed and needs fixing but it's unclear where the money will come from. Canada Mortgage and Housing Corporation will soon be handing over responsibility for the complex to BC Housing. Wheeler claims ever since the change of hands was announced, all talks with CMHC died. Wheeler adds CMHC also stopped providing some additional monthly funding becase it found the complex was not financially viable. He admits maintanence was not kept up over the years but attributes that to funding shortfalls as well. Peninsula Estates was built in 1982 and features 18 apartments and 52 townhouses. About a third of the units are subsidized. Quote
Recommended Posts
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.