Guest guest Posted August 21, 2006 Report Posted August 21, 2006 They didn't mention the species/genus of mold. Lovely, abestos in here too. I figured there was abestos too. Boss tried to say it can't be doing anyone harm, please! Didn't mention why I left b/c they were Laughing about it! And do you thing Facility Management with the State does any of this under containment, NO. Mycotoxins still everywhere in here afterwards and they will just spread more. Here's the email I got today... On August 11, 2006, I met with Steve and Roughton regarding removing mold growth from the affected ductwork in the receiving area of the SRC. The spay coating on the ductwork that Mr. Lipton referred to on page 2 of his report is actually textured paint that contains asbestos. Since the Mold growth in on asbestos containing material (ACM), this makes the clean up work more involved and labor intensive. The good news is FM HVAC shop will perform the clean up activities over a weekend in the next few weeks. Roughton will need to have some time to order/ build replacement parts for ductwork that will be removed during the clean up. Here's my understanding of the scope of the work: FM will remove ACM truck lines and replace with new ductwork. The rusty diffuser will be removed and replaced. Several HVAC ductwork boxes that cannot be removed will be cleaned with bleach and insulated. This will keep the ACM contained and prevent new mold growth. The flexible hose lines that attach to the metal ductwork will be cleaned or replaced. Since there will be a disturbance of ACM, the HVAC system will be shut down during clean up and demolition activities. FM will clean HVAC air supply vents and replace water damaged ceiling tile in the entrance lobby of the SRC. Roughhton and Seve attempted to discuss the scope of the clean up in the entrance lobby with Rhonda . Rhonda didn't want to hear what they had to say and left the building. When Rhonda returned I explained to her about the upcoming clean up of the entrance lobby/receiving area. This information was fairly well received by Rhonda. Rhonda asked me about how much money she would get monthly if she applied for disability. I am going to look into how she can obtain an estimate of long-term disability benefits and a disability retirement benefit calculation Ed, will contact you when he is ready to schedule the work. 1) Please call in a work order to have the construction services to clean and replace weather curtains as needed. 2) Per FM, please remove table from front of electrical panel box on 4-A. 3) Mail will need to be removed from the receiving area in the afternoon, before clean up starts. 4) At your convenience, we should talk about how to address ACM damaged floor tile on level 4-A. Please refer to the laboratory report that I gave Dick on August 10. Please let me know if you have any questions about any of the above information. Thanks. RW 8/14/06 Quote
Guest guest Posted August 21, 2006 Report Posted August 21, 2006 so sorry you have had to go through this, but you at least got something to be done. hang in there, hope your felling better. --- In , " austingirl5262 " <austingirl5262@...> wrote: > > They didn't mention the species/genus of mold. Lovely, abestos in > here too. I figured there was abestos too. Boss tried to say it can't > be doing anyone harm, please! Didn't mention why I left b/c they > were Laughing about it! And do you thing Facility Management with > the State does any of this under containment, NO. Mycotoxins still > everywhere in here afterwards and they will just spread more. Here's > the email I got today... > > On August 11, 2006, I met with Steve and Roughton > regarding removing mold growth from the affected ductwork in the > receiving area of the SRC. The spay coating on the ductwork that Mr. > Lipton referred to on page 2 of his report is actually textured paint > that contains asbestos. Since the Mold growth in on asbestos > containing material (ACM), this makes the clean up work more involved > and labor intensive. The good news is FM HVAC shop will perform the > clean up activities over a weekend in the next few weeks. > Roughton will need to have some time to order/ build replacement > parts for ductwork that will be removed during the clean up. Here's > my understanding of the scope of the work: FM will remove ACM truck > lines and replace with new ductwork. The rusty diffuser will be > removed and replaced. Several HVAC ductwork boxes that cannot be > removed will be cleaned with bleach and insulated. This will keep the > ACM contained and prevent new mold growth. The flexible hose lines > that attach to the metal ductwork will be cleaned or replaced. Since > there will be a disturbance of ACM, the HVAC system will be shut down > during clean up and demolition activities. FM will clean HVAC air > supply vents and replace water damaged ceiling tile in the entrance > lobby of the SRC. Roughhton and Seve attempted to > discuss the scope of the clean up in the entrance lobby with Rhonda > . Rhonda didn't want to hear what they had to say and left the > building. When Rhonda returned I explained to her about the upcoming > clean up of the entrance lobby/receiving area. This information was > fairly well received by Rhonda. Rhonda asked me about how much money > she would get monthly if she applied for disability. I am going to > look into how she can obtain an estimate of long-term disability > benefits and a disability retirement benefit calculation > > Ed, will contact you when he is ready to schedule the work. > > 1) Please call in a work order to have the construction services to > clean and replace weather curtains as needed. > > 2) Per FM, please remove table from front of electrical panel box on > 4-A. > > 3) Mail will need to be removed from the receiving area in the > afternoon, before clean up starts. > > 4) At your convenience, we should talk about how to address ACM > damaged floor tile on level 4-A. Please refer to the laboratory > report that I gave Dick on August 10. > > Please let me know if you have any questions about any of the above > information. > > Thanks. > RW > 8/14/06 > Quote
Guest guest Posted August 22, 2006 Report Posted August 22, 2006 Since the mycotoxins are being circulated thru the air intake, doesn't that mean the abestos is too as well as all in the air around me? I'm so MAD! And they are using bleach! I wonder if life is better on another planet. Wonder if mold and abestos exist there. I can't get away from this poison! I'm so TIRED............................... Rhonda > > They didn't mention the species/genus of mold. Lovely, abestos in > here too. I figured there was abestos too. Boss tried to say it can't > be doing anyone harm, please! Didn't mention why I left b/c they > were Laughing about it! And do you thing Facility Management with > the State does any of this under containment, NO. Mycotoxins still > everywhere in here afterwards and they will just spread more. Here's > the email I got today... > > On August 11, 2006, I met with Steve and Roughton > regarding removing mold growth from the affected ductwork in the > receiving area of the SRC. The spay coating on the ductwork that Mr. > Lipton referred to on page 2 of his report is actually textured paint > that contains asbestos. Since the Mold growth in on asbestos > containing material (ACM), this makes the clean up work more involved > and labor intensive. The good news is FM HVAC shop will perform the > clean up activities over a weekend in the next few weeks. > Roughton will need to have some time to order/ build replacement > parts for ductwork that will be removed during the clean up. Here's > my understanding of the scope of the work: FM will remove ACM truck > lines and replace with new ductwork. The rusty diffuser will be > removed and replaced. Several HVAC ductwork boxes that cannot be > removed will be cleaned with bleach and insulated. This will keep the > ACM contained and prevent new mold growth. The flexible hose lines > that attach to the metal ductwork will be cleaned or replaced. Since > there will be a disturbance of ACM, the HVAC system will be shut down > during clean up and demolition activities. FM will clean HVAC air > supply vents and replace water damaged ceiling tile in the entrance > lobby of the SRC. Roughhton and Seve attempted to > discuss the scope of the clean up in the entrance lobby with Rhonda > . Rhonda didn't want to hear what they had to say and left the > building. When Rhonda returned I explained to her about the upcoming > clean up of the entrance lobby/receiving area. This information was > fairly well received by Rhonda. Rhonda asked me about how much money > she would get monthly if she applied for disability. I am going to > look into how she can obtain an estimate of long-term disability > benefits and a disability retirement benefit calculation > > Ed, will contact you when he is ready to schedule the work. > > 1) Please call in a work order to have the construction services to > clean and replace weather curtains as needed. > > 2) Per FM, please remove table from front of electrical panel box on > 4-A. > > 3) Mail will need to be removed from the receiving area in the > afternoon, before clean up starts. > > 4) At your convenience, we should talk about how to address ACM > damaged floor tile on level 4-A. Please refer to the laboratory > report that I gave Dick on August 10. > > Please let me know if you have any questions about any of the above > information. > > Thanks. > RW > 8/14/06 > Quote
Recommended Posts
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.