Guest guest Posted May 12, 2006 Report Share Posted May 12, 2006 Confront Mold During Construction Phase to Prevent Future Problems By Lizandra , Moisture & IAQ Solutions Inc. http://www.multi- housingnews.com/multihousing/reports_analysis/feature_display.jsp? vnu_content_id=1000620941 & imw=Y SEPTEMBER 01, 2004 -- The heightened sensitivity to mold that has arisen over the last couple of years has prompted more and more developers to implement a mold action plan, which deals exclusively with the goal of reducing the risk of mold in new properties during the construction phase. It consists of procedures for handling building materials, managing construction scheduling and closing up concealed spaces, among other " anti-mold " protocol. Such a mold action plan goes a long way toward helping developers to mitigate their risk regarding mold exposure--and all the problems that come with it, from scheduling delays and added costs during the building phase, to withheld rent and expensive litigation after residents take occupancy. Mold action plans should be detailed game plans, where all parties involved in the construction process are given instruction and guidance on the prevention of moisture intrusion and mold growth, as well as what to do in the event of actual moisture intrusion and/or mold growth. The plans must always be tailored according to the needs of a particular project, but in every case, each party involved in the construction process has a role that they must play to ensure that the action plan is adhered to. For example, construction contractors would be responsible for the way they handle and store construction materials on work sites and for ensuring that their employees and subcontractors perform in accordance with plans, specifications and other contract documents. Design professionals would be responsible for the building's envelope and HVAC and other mechanical systems, including design details that often have the potential to cause or prevent a typical moisture-intrusion and/or mold problem. Design professionals and developers would be responsible for the building materials and systems that they specify. And ultimately, of course, the owners would be responsible for the operation and maintenance of a building once it is completed. This approach of involving all parties in the construction process will, in the long run, mitigate the risk of mold growth and any future claims that may arise. And perhaps most importantly, the mold action plan also entails having a mold consultant conduct periodic site inspections at key phases in the construction or during regularly scheduled intervals to ensure the plan is being followed and implemented during the construction process. Having such a detailed mold action plan in the file of construction documents for a multifamily structure is an effective tool toward refuting potential future claims, in that the field observer will have documented conditions and addressed any problems related to moisture intrusion and mold growth as the construction progressed. The effectiveness of a litigant's claim that a current mold problem was " encouraged " during the construction phase is rendered much less effective in the face of documented evidence to the contrary. In a condominium setting, occupants are individual unit owners with a significant financial stake in the asset. With this type of property, a developer can be adversely affected by a single mold problem if one or more owners, or perhaps even the entire homeowners' association, retain a lawyer who claims the building was encumbered with mold prior to its being turned over. However, the periodic site visits conducted and documented photographs taken during the construction phase can be presented as evidence that everything--from the way materials were stored to the method by which water and moisture were kept out of the structure as it was built--was handled appropriately. In fact, should mold occur at any time after construction is completed, the developer may claim contributory negligence on the part of the individual unit owner(s). The cost of litigation revolving around mold and moisture intrusion problems can be huge. And today, developers cannot depend on insurance to cover these claims because they're likely to find that insurance companies are excluding mold coverage from their commercial general liability policies. As a result, developers must internally manage mold-related risk. Planning for potential moisture intrusion problems (including a thorough action plan as part of the building process) is a significant step in the right direction. The Mold Menace Essentially, all new construction has the potential to allow conditions that are conducive to mold growth. The majority of building materials have the potential to be exposed to the elements, such as rain, until that particular building is dried out. Developers and their representatives should visually inspect building material prior to storage to ensure that the materials were delivered in original, factory-sealed, unopened packages, containers or bundles. Wet or moldy packages should be rejected and returned or segregated from the clean materials for resolution. Any water on the surfaces of the packages should be wiped dry to avoid adding moisture to storage areas; if the water cannot be wiped dry, then those packages with water or mold damage should be separated from clean material to eliminate situations where mold can spread to clean materials in the storage area. It is also important to follow the manufacturer's directions for materials storage. The storage area should be well prepared prior to storage, and it should be a fully enclosed, preferably hard-floored, dry location or, at a minimum, a location with a watertight roof near where the materials will be used. If the materials are stored in areas where rain or construction- process water could fall on them, they should be covered with tarpaulins that are heavy enough to withstand any wind or other harsh conditions. While the tarpaulin should be weighted down on top to prevent it from blowing away, it should not be tight against the sides of the stack because this can reduce air circulation and hold moisture inside the sheeting. It is important that the stored material be inspected frequently to ensure that the protective measures are still in place and that no damage has occurred since the last inspection. These inspections should take place on a weekly basis and if outside conditions drastically change, the inspections should be done at least every couple of days. Materials such as wood studs or drywall that have been exposed to the elements and not properly dried or removed if mold growth is observed have the potential to create mold concerns after they are enclosed in wall and ceiling cavities. Even though mold spores may initially be dormant or inactive, high relative humidity or moisture intrusion, via a pipe leak, roof leak, window leak or condensation, can turn it into active mold growth. A mold action plan takes all of these issues into account and illustrates appropriate measures for avoiding mold in the first place. But wet building material is only the beginning. New construction goes through a final tweaking phase that essentially tightens up all systems and components. During this phase, building materials are highly susceptible to moisture intrusion. Remediating the affected materials as soon as possible is the key to avoiding future problems. Again, a provision for the identification of problem spots and prompt remediation would be outlined in the action plan. As mentioned, the key to successfully developing and implementing a mold action plan is communication and collaboration among all parties involved in the construction process. Each party has an important role to play in ensuring that the action plan is implemented, and if all parties fulfill their part, the risk of mold growth and future claims can be mitigated from the beginning, and thus reduce future liabilities. So, at the end of the day, the best defense is a good offense: Applying the mold prevention practices outlined in a mold action plan during construction can greatly reduce the risk of health problems for occupants and financial threats potentially caused by mold. The key is to have a plan of action in place--and a method for acting on that plan as quickly as possible. Lizandra is assistant vice president of Moisture & IAQ Solution Inc., a consulting firm based in White Plains, N.Y. specializing in moisture intrusion, microbiological assessment and IAQ services. Principals of the firm chair the American Society for Testing and Materials (ASTM) committee that is developing a national standard for conducting mold surveys Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.