Jump to content
RemedySpot.com

Re: federally acceptable count for buildings is 200-400 parts per million??

Rate this topic


Guest guest

Recommended Posts

Guest guest

Something is wrong with this picture. I'm glad they had it checked

and I'm glad they took care of themselves, but the lab data is

screwy. I'd like to know what type of sample gave him data in parts

per million. I don't know of any. Also, what federally accepted count

exists? I don't know of any. Even the standard for aiborne dust that

does exist is NOT in parts per million.

Carl Grimes

Healthy Habitats LLC

-----

> Journal/Sam Green

> discusses moving the Jewel Box business out of the

> Valley Towers building because of black mold in the basement.moldy

> building • The mold-spore air count in the Valley Towers basement was

> 465,953 parts per million. • The federally acceptable count for

> buildings is 200-400 parts per million. The federally acceptable

> mold-spore count in any building is 200 to 400 parts per million, said

> Wade Greene, building inspector for the city of Cortez.

Link to comment
Share on other sites

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...