Guest guest Posted January 20, 2006 Report Posted January 20, 2006 01/20/06 More mold sources found in North Port Head Start building http://www.sun-herald.com/NewsArchive2/012006/tp5np6.htm? date=012006 & story=tp5np6.htm Charlotte,FL NORTH PORT -- Consultants have identified what they believe are additional sources of mold-promoting moisture at the Head Start building in North Port, officials say. In December, Head Start moved children out of the portable classroom near Glenallen Elementary School because previous efforts to remove mold had been ineffective, officials said, and children were put into other Head Start groups in Sarasota or Charlotte counties while the problem was investigated. Head Start is a federal program serving children ages 2 months to 5 years old. The program prepares children of low-income families for school. Environmental Safety Consultants on Monday told Children First, the agency that manages North Port's Head Start program, that there appeared to be two additional sources of moisture that was contributing to mold growth in the classroom. First, consultants said, moisture appeared to be getting into a paneled wall through a window. Second, there appeared to be a water leak in a supply line near the restrooms, they said. By the end of this week, consultants expect to inform Children First whether the problems can be corrected and the mold remediated. If remediation is technically feasible, then Children First will examine the cost and the time frame of performing the remediation. Children First is constructing a new building for the Head Start program that could be ready by October or November. A Charlotte County school was in a similar situation last fall because of mold found behind some of its walls. Students at Charlotte County's Baker Center campus were relocated to the East Elementary School campus. The East Charlotte Avenue center, which was destroyed by Hurricane Charley in 2004, serves about 130 preschoolers in the federally sponsored Head Start pre-K program. Mold was found on 70 wooden panels in two connected modular wood buildings. Philip Tavill, executive director of Children First, said the agency moved the Head Start program out of the portable units last fall when mold was first discovered. " We moved the kids out of there when we did the first remediation, which was to replace the air-conditioner ducts, " Tavill said. " The consultants said we only needed to clean that duct, but we went ahead and replaced the whole thing because we didn't want to take any chances where the children are concerned. " Floor tiles were removed and new carpeting was installed at the same time. Walls and other surfaces were cleaned with a bleach solution. However, within a few weeks, evidence of mold returned. Children First found other places in the area for the children to go for their Head Start program. " We would not want the children to move back into that building until it was fully remediated, " Tavill said. You can e-mail Hoffman at shoffman@.... By SUSAN E. HOFFMAN North Port Assistant Editor Quote
Recommended Posts
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.