Guest guest Posted December 28, 2006 Report Share Posted December 28, 2006 Dear Puneet I think the topic,SIMOPS, is first time in the group.It seems not many are aware about SIMOPS procedure,didn't see any further postings on that. I think SIMOPS procedure is followed only in Oil & Gas field operations , please correct if am wrong. I know 2 kinds of SIMOPS , 1. SIMULTANEOUS DRILLING, PRODUCTION and LIGHT CONSTRUCTION OPERATIONS This refer to any activity with a drilling or work-over rig conducted concurrently with production (or injection) of hydrocarbons and light construction activities and/or well servicing activities. 2. SIMULTANEOUS CONSTRUCTION and PRODUCTION OPERATIONS This for conducting construction and heavy maintenance activities on, or in the vicinity of, production facilities. SIMOPS aims at decreasing the level of risk associated with operations by - imiting the number of simultaneous activities- Giving general preventive measures to be implemented prior to starting simultaneous activities- Setting rules about organization, procedures and equipment. Simultaneous Operations (SIMOPS) includes offshore moving of the heavy marine units needed in support of well operations or construction activities. Mr.Puneet ,can you share your SIMOPS matrix about prohibited,restricted & unrestricted operations. Hope to see more postings from Puneet and others on the subject. Regards Sanoj _____________________________Puneet Khanna wrote: Dear all Can we have brainstorming on SIMOPS (Simultaneous operations)?? Broadly, it states the guidelines when having more than 1 major activites at the installation at the same time. For example, for an offshore production installation like ours, the major activities become Drilling, Work over operations, Wireline operations, Snubbing, CTU jobs, Perforation, Pigging, construction jobs, Diving, Welding in undesignated area, etc. The SIMOPS Matrix identifies the following situations: 1. Which Activities can be normally conducted 2. Which Activities are generally allowed with certain precautions 3. Which Activities are allowed with approval to deviate 4. Which Activities are not allowed This is brief about it, just to trigger the discussion. Regards Puneet Khanna Mumbai Offshore Region ONGC __________________________________________________ Quote Link to comment Share on other sites More sharing options...
Guest guest Posted January 12, 2007 Report Share Posted January 12, 2007 Dear all Attached herewith is the SIMOPS Matrix followed at our oil & gas offshore field. It clearly defines simultaneous activities which can be normally conducted, which are generally allowed with certain precautions, which are allowed with approval to deviate & which are not allowed at all. Puneet Khanna Dear Puneet I think the topic,SIMOPS, is first time in the group.It seems not many are aware about SIMOPS procedure,didn't see any further postings on that. I think SIMOPS procedure is followed only in Oil & Gas field operations , please correct if am wrong. I know 2 kinds of SIMOPS , 1. SIMULTANEOUS DRILLING, PRODUCTION and LIGHT CONSTRUCTION OPERATIONS This refer to any activity with a drilling or work-over rig conducted concurrently with production (or injection) of hydrocarbons and light construction activities and/or well servicing activities. 2. SIMULTANEOUS CONSTRUCTION and PRODUCTION OPERATIONS This for conducting construction and heavy maintenance activities on, or in the vicinity of, production facilities. SIMOPS aims at decreasing the level of risk associated with operations by - imiting the number of simultaneous activities- Giving general preventive measures to be implemented prior to starting simultaneous activities- Setting rules about organization, procedures and equipment. Simultaneous Operations (SIMOPS) includes offshore moving of the heavy marine units needed in support of well operations or construction activities. Mr.Puneet ,can you share your SIMOPS matrix about prohibited,restricted & unrestricted operations. Hope to see more postings from Puneet and others on the subject. Regards Sanoj _____________________________Puneet Khanna wrote: Dear all Can we have brainstorming on SIMOPS (Simultaneous operations)?? Broadly, it states the guidelines when having more than 1 major activites at the installation at the same time. For example, for an offshore production installation like ours, the major activities become Drilling, Work over operations, Wireline operations, Snubbing, CTU jobs, Perforation, Pigging, construction jobs, Diving, Welding in undesignated area, etc. The SIMOPS Matrix identifies the following situations: 1. Which Activities can be normally conducted 2. Which Activities are generally allowed with certain precautions 3. Which Activities are allowed with approval to deviate 4. Which Activities are not allowed This is brief about it, just to trigger the discussion. Regards Puneet Khanna Mumbai Offshore Region ONGC __________________________________________________ Quote Link to comment Share on other sites More sharing options...
Guest guest Posted January 12, 2007 Report Share Posted January 12, 2007 Thanks for your sharing mate Re: Simultaneous operations Dear all Attached herewith is the SIMOPS Matrix followed at our oil & gas offshore field. It clearly defines simultaneous activities which can be normally conducted, which are generally allowed with certain precautions, which are allowed with approval to deviate & which are not allowed at all. Puneet Khanna Dear Puneet I think the topic,SIMOPS, is first time in the group.It seems not many are aware about SIMOPS procedure,didn't see any further postings on that. I think SIMOPS procedure is followed only in Oil & Gas field operations , please correct if am wrong. I know 2 kinds of SIMOPS , 1. SIMULTANEOUS DRILLING, PRODUCTION and LIGHT CONSTRUCTION OPERATIONS This refer to any activity with a drilling or work-over rig conducted concurrently with production (or injection) of hydrocarbons and light construction activities and/or well servicing activities. 2. SIMULTANEOUS CONSTRUCTION and PRODUCTION OPERATIONS This for conducting construction and heavy maintenance activities on, or in the vicinity of, production facilities. SIMOPS aims at decreasing the level of risk associated with operations by - imiting the number of simultaneous activities- Giving general preventive measures to be implemented prior to starting simultaneous activities- Setting rules about organization, procedures and equipment. Simultaneous Operations (SIMOPS) includes offshore moving of the heavy marine units needed in support of well operations or construction activities. Mr.Puneet ,can you share your SIMOPS matrix about prohibited,restrict ed & unrestricted operations. Hope to see more postings from Puneet and others on the subject. Regards Sanoj ____________ _________ ________Puneet Khanna <firepuneetgmail (DOT) com> wrote: Dear all Can we have brainstorming on SIMOPS (Simultaneous operations)? ? Broadly, it states the guidelines when having more than 1 major activites at the installation at the same time. For example, for an offshore production installation like ours, the major activities become Drilling, Work over operations, Wireline operations, Snubbing, CTU jobs, Perforation, Pigging, construction jobs, Diving, Welding in undesignated area, etc. The SIMOPS Matrix identifies the following situations: 1. Which Activities can be normally conducted 2. Which Activities are generally allowed with certain precautions 3. Which Activities are allowed with approval to deviate 4. Which Activities are not allowed This is brief about it, just to trigger the discussion. Regards Puneet Khanna Mumbai Offshore Region ONGC ____________ _________ _________ _________ _________ __ Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.