Guest guest Posted September 17, 2010 Report Share Posted September 17, 2010 Okay - I think I have this designed right, but would just like to run it by everyone to make sure it looks okay. I have two Sources (1 for each channel) both going into a single Coherence object set to 12-15Hz. The Coherence goes into a Threshold object, which is set for increase. 75 percent reward seemed reasonable. Then the threshold simply goes out to DVD or midi reward bell. Very simple. I don't have a Y cable, so I thought I would just use two electrodes as close to Cz as possible, and link them with the linked reference cable. If that approach is not recommended or correct, my other thought was to do the same basic design but as single channel training, training P3+Cz for a while, and then just switching the active electrode to P4 for a while. Comments? thank you, JW Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.